buy hypertropin
Home » Archive

Articles in the ElyQ Vision 50E Category

ElyQ Vision 50E, Team Reviews »

30 October 2011 | posted by Mattie Lodge

Hi Guys,

I’ve been fortunate enough to have been sent an Ely-Q Vision 50 E by Fast Lad for test and to see what I think of it. So to keep things out in the open, I’m going to post my thoughts on the ‘Review blog page’ of the site.

ElyQ Vision 50E, Team Reviews »

27 October 2011 | posted by Mattie Lodge

Opening the box you are presented by with align style sub box system. Nice and neat :)

After unpacking each sub box, separately indented bags are found with the kit contents enclosed. Each bag is coded to correspond with the relevant page in the great looking build manual.

Easy to …

ElyQ Vision 50E, Team Reviews »

26 October 2011 | posted by Mattie Lodge

First part of the build is the lower frames and skids assembly.

The Vision 50E frame is a multi-stacked system, similar to the Vision Competition but with extra width to accommodate the batteries.

First the skids and two lower side fames are assembled.

The skids were a little awkward to …

ElyQ Vision 50E, Team Reviews »

24 October 2011 | posted by Mattie Lodge

Upper frame build is next.

As mentioned earlier in the blog. The frame in a multi-stacked system. This part shows the upper frame build and then to follow how it fits to the rest of the frame.

Here are the parts that make up this section.

One side is selected …

ElyQ Vision 50E, Team Reviews »

23 October 2011 | posted by Mattie Lodge

Next job is to join the upper and lower frames

Using various spacers and long M3 allen bolts the upper and lower frames are joined together. Once again I loctited all the bolts and put them in loosely until all were installed. Then nipped them up making sure the frames …

ElyQ Vision 50E, Team Reviews »

23 October 2011 | posted by Mattie Lodge

In the manual the next step is to fit the tail boom. This section I have skipped for the time being as it’s much easier to work on the heli with no boom attached.

Ok, so I installed the radio gear but as of yet not connected the links up

ElyQ Vision 50E, Team Reviews »

22 October 2011 | posted by Mattie Lodge

Final building part of the heli is the rotor head.

This is a simple rotor head design with a standard parts layout

Low parts count on this section. I like the two piece grips. This means in the event of a crash you should only have to replace the arms. …

ElyQ Vision 50E, Team Reviews »

22 October 2011 | posted by Mattie Lodge

Next on the agenda is the tail end.

The tail gearbox comes complete and ready to fit. I’m always a little worried about this, so in my normal fashion I took it to bits to check that loctite was present. Every bolt was done which was good news. :)

The …

ElyQ Vision 50E »

21 October 2011 | posted by Mattie Lodge

Onto the final assembly of the Vision 50 E now.

The FBL head is very simple and pretty standard as they go for this type of model. Its held on by a single top shanked bolt. The swash driver is also a standard clamp type unit.

I used the lengths

ElyQ Vision 50E »

20 October 2011 | posted by Mattie Lodge

I finally got chance to test fly the Ely-Q vision 50e and put it up on the team Youtube site

Check it out :)

[youtube_sc url="http://www.youtube.com/watch?v=hizrAA5qt5Q"]…